Sport Complexes
Construction of indoors swimming pools with underground parking space and upgrade of existing indoors gymnastic facility, of total surface of 7.700m2.
Indoors Gymnastic Facility (capacity : 1500 spectators) in Faliraki area in Rhodes (Detailed Design) (2008)
Swimming Pool in Agia Paraskevi (capacity: 300 spectators), including an Olympic size competition pool as well as a teaching one, auxiliary area and underground parking space (Offer Design) (2007)
Technical Consultant for the E/M Installations in Votanikos (swimming pools, basket-volley-handball arenas, etc.) (under execution) – Preliminary Design of E-M Installations
Lighting Study (Electrical Substation – Emergency Generator – Power Distribution Network) (2007)
Municipality of Evosmos 1000 seats and Municipality of Aspropirgos 800 seats
Sports and Cultural Center Municipality of Athens swimming pool with 300 seats, 2 Museums and Offices Building* (Offer Design)
Indoor Gyms in Spata and Glifada 1000 seats, 3.000 m2 *
Kautatzogleio Stadium in Thessaloniki of 28.500 seats, 35.000 m2 – Refurbishment*
Fire Protection (Fire Fighting & Fire Detection) Study
Design and Development Study. Reformation and installation of necessary equipment of the Olympic Complex, Goudi Athens*
- Pampeloponissiako Stadium 21.000 seats, 140.860 m2
- Panthessaliko Stadium, 22.000 seats, 127.800 m2
- IBC
- Race Course, 940.000 m2**
- o Markopoulo Shooting Center, 4.000 seats, 312.000 m2**
- Olympic Aquatic Center, Indoor 5.500 seats and outdoor 8.000 seats
- Galatsi Arena, 6.500 seats, 95.000 m2*
- o Alexandrio Sports Hall, 4.800 seats*
National Stadium of Halkida, 10.000 seats* (design according to international games standards)
PAOK Football Court 4.000 m2 in Toumba, Thessaloniki* – Upgrades
Olympic Main Press Center (M.P.C.) 50.000m2, Kifissias Avenue, Athens
18000 seats – Conference Center – Preliminary Training Room – Landscaping, Thessaloniki (participation 50%)**
Heraklion Sports Hall, 5500 seats*
Formula 1 Circuit at Orchomenos, Viotia
“Peace & Friendship” Sport Complex (Sports Hall, Conference Center, Training Rooms, Landscaping, Docks, Ice-skating ground etc.)*
* Participation : 30%, ** Participation : 50%, *** Participation : 70%