• Standard Bioclimatic Nursery School in Plato’s Academy (2012) . Study for a robust building developing at one level (ground floor) with zero consumption. It includes a multipurpose room, two rooms, sleeping place, kitchen, offices, storage, E/M engine rooms facilities and tank firefighting.
  • Psychiatric Clinic “Breath of Life” in Achaia of 5 floors of total surface ~10.400m2 (200 beds). (2011) Energy Design according to KENAK (Buildings Energy Performance Regulation)
energeiaka-erga-1
  • Recovery – Rehabilitation Center , for hospitalised and outpatients in Heraklion, of total surface ~5.800m2 (80 beds) (2011) Energy Design according to KENAK (Buildings Energy Performance Regulation)
  • G. I. Stamatakou Youth Institution: Student Dorms in Kastri Kinourias of ~3.000m2, (98 beds) (2011) Energy Design according to KENAK (Buildings Energy Performance Regulation)
  • Autonomous Residence Complex in Limnos Island with the use of PV Panels and Wind Turbines. (2011)
  • Residence in Milos Island with basement, swimming pool and geothermal power (owner Mr. Yiotis) (2011)
  • 3 2-storey house complexes in Siros Island of total surface ~450 m2 with 4 identical swimming pools (2010) Energy Design according to KENAK (Buildings Energy Performance Regulation)
  • 3 2-storey house complexes in Siros Island of total surface ~470 m2 with swimming pool (2010) Energy Design according to KENAK (Buildings Energy Performance Regulation)
  • General Prefectural Hospital of Halkida of 330 beds. Energy Design according to the European Union Directive 2002/91/ΕΚ for Energy Performance in Buildings
  • 3,953 MWp Solar Park in France Rechicourt le chateau (2015). Verification of electrical diagrams and substation materials, panel diagrams and substation materials, cable calculation, MV and LV network, control and automation systems, grounding system study, BOQ of basic equipment (cables, pillar, switches, etc.).
energeiaka-erga-4
  • Technical Evaluation of PV Parks up to 2MW (assigned by Eurobank EFG) (2012)
  • PV System on the Roof of 9,87 KW (owner : Mrs Giannopoulou) in Athens . Design – Construction Supervision (2011)
energeiaka-erga-5
energeiaka-erga-6
  • PV System on the Roof of 9,45 KW (owner : Mrs Ladopoulou) in Athens. Design – Construction Supervision (2011)
energeiaka-erga-7
energeiaka-erga-8
energeiaka-erga-9
  • PV System on the Roof of 9,45 KW (owner : Mrs Bairaktari) in Athens. Design – Construction Supervision (2011)
energeiaka-erga-10
  • PV System on the Roof of 9,45 KW (owner : Mr Zapros), placed in Kilkis Region. Design – Construction Supervision (2011)
  • PV System on the Roof – Design for the General Hospital of Grevena (assigned by Post Bank and Post Bank Green Institute) (2011)
  • PV System on the Roof – Design for the General Hospital of Kastoria (assigned by Post Bank and Post Bank Green Institute) (2011)
  • PV Park Design of 100 KW in Gortynia (owner Mrs Della) (2011)
  • PV Park Design of 100 KW in Vytina (owner Mr Gontikas) (2011)
  • PV Park Design of 100 KW in Argolida (owner Mrs Kotsovou) (2011)
  • PV Plants in Rhodes Island (2010) (in execution)
    • PV Park 100 KW Position Lahania132 Petaso
    • PV Park 100 KW Position Maritsa 427 Mauro
    • PV Park 65 KW Position Lahania 136 Petaso
    • PV Park100 KW Position Paspida 631 Petaloudes Municipality
    • PV Park 100 KW Position St John Arnitha 470
    • PV Park100 KW Position St John Arnitha 471
    • PV Park 100 KW Position 323Α Arnitha
    • PV system 8 KW Damagitou street 11
  • Biogas Production Unit in Tripoli (480KW power)
  • Hybrid Power Project in Ikaria
    It includes the works : Small Hydroelectric Power Plant of Prospera, Small Hydroelectric Power Plant of Lower Prospera, Pump Station, Wind Turbines in Stravokountoura, Electrical power Distribution Control Room in Ag. Kirikos (2009)
  • King Abdullah II Park in Amman of ~500 km2 (2009) Lighting, Energy Consumption Design of the Park and the buildings
  • PV Systems and Free Cooling in 103 base stations of Vodafone’s radio network
energeiaka-erga-13
  • Holly Monastery Megistis Lavras Hydroelectric Plant 270KW, Mount Athos*
  • Holly Monastery of Announciation District heating using Biomass boiler 1.000.000 kcal/h and dual fuel boiler (Oil / LPG) 1.000.000kcal/h, Halkidiki
energeiaka-erga-15
  • Holly Monastery Simonos Petras Renewable Energy Sources Hybrid System consisting of PV 92KW, Hydroelectric Plant 34KW,and Diesel Generator 50KW, Mount Athos****
energeiaka-erga-16
  • Solar Village, Attica, Design and Optimization of the Energy Systems (Bidding Study)
  • Participation in Bidding Studies for Tri-generation Systems in the Hospitals : G.H.A “Sismanogleio” (Thermal power : 1462 KW, Electrical power : 1415 KW ), “Attico” (Thermal power : 1169 KW, Electrical power : 1130 KW), “Gennimatas” (Thermal power : 877 KW , Electrical power : 844 KW), “Evagelismos” (Thermal power : 1462 KW, Electrical power : 1415 KW), “ΚΑΤ” (Thermal power : 877 KW, Electrical power : 844 KW) (2008)
  • N.T.U.A. *
    Cogeneration Plant – Boiler Control Room – Chiller Room – Distribution System, Athens
  • Medical and Biological Research Center, Academy of Athens
    Cogeneration Plant : Electrical 530 KWe and Thermal Power 773 KWth
energeiaka-erga-18

* Participation : 30%, ** Participation : 50%, *** Participation : 70%